mtu PowerPacks for Marco Polo Rail
Six mtu PowerPacks have been delivered for three Marcopolo Rail multiple units in Teresina, Brazil; a further six systems are planned for a follow-up project. The first train is scheduled to enter assisted operation service in October 2026